Phuket has three transport projects that would change how a home on the west coast is reached: an expressway and tunnel from Kathu to Patong, a second phase of the airport, and a tram from the airport to Chalong. None of them is open. One is waiting for Cabinet, one is being designed, and one is still a study. This page is a status table, each row on an official’s own word and date, last checked on 10 October 2026.
- 3.98 km
- Kathu to Patong, phase 1Elevated road and mountain tunnel. EXAT, via The Nation, 13 September 2026
- THB 16.76bn
- phase 1 investmentTHB 5.79bn land, THB 10.97bn building and supervision. Same source
- 12.5m to 18m
- airport passengers a yearAOT's phase 2 target for 2029. Bangkok Post, 16 May 2025
- 41.7 km
- tram, airport to ChalongFirst stage. Transport Minister, via The Nation, 29 April 2024
The status table
Four rows, four stages. The word in the corner is the stage; the text is who said what, and when.
Kathu to Patong expressway, phase 1
A 3.98 km elevated road and tunnel. The revised plan, with the tunnel cut from 17 m to 14 m across, is due at Cabinet in December 2026. If approved: land acquisition finished by January 2027, a contractor chosen by April 2027, four years of building from October 2027, completion September 2031, opening targeted October 2031. Those are the Deputy Government Spokeswoman's dates, Ploytalay Laksameesangchan, reported by The Nation on 16 September 2026. Checked 10 October 2026.
Expressway phase 2, airport to Kathu
Named in the Transport Ministry's plan of October 2025 with building from 2027 and service from 2030 (Government Public Relations Department, 22 October 2025). No Cabinet date and no funding have been announced since. The 2030 figure is older than the phase 1 timetable above, which already runs to 2031, so treat it as superseded until the ministry restates it. Checked 10 October 2026.
Phuket airport, phase 2
Airports of Thailand's plan adds 5.5 million passengers a year to a 12.5 million airport, taking it to at least 18 million, with about THB 10 billion for the international terminal and utilities; the design stage was due to finish in 2026 (The Nation, 16 May 2026). AOT's target for completion is 2029 (Bangkok Post, 16 May 2025). We have found no published contract award. Checked 10 October 2026.
Tram, airport to Chalong
A 41.7 km first stage. The Transport Minister's own schedule, reported by The Nation on 29 April 2024: MRTA board approval by June 2026; State Enterprise Policy Office, PPP committee and Cabinet between July 2026 and February 2027; bidding March 2027 to August 2028; building from September 2028; operating by December 2031. Electric buses are to run the route first (Government Public Relations Department, 22 October 2025). Nothing has been built. Checked 10 October 2026.
Why the dates differ from the ones you were told
Because they move, and because a brochure quotes the oldest, kindest version.
Read the full explanation
In October 2025 the Transport Ministry described the Kathu to Patong road as starting in 2026 and opening in 2030. Eleven months later the government’s own spokeswoman gave a start of October 2027 and an opening of October 2031, with Cabinet approval still ahead. Neither statement was wrong when made; the second replaces the first. A page that printed “opens 2030” in October 2025 is already a year out, which is why every row above carries a date and a check mark rather than a promise.
The same applies to the tram, which was once expected in 2026 and is now scheduled, on the minister’s word, for December 2031 after a bidding process that has not begun. The airport’s 2029 is AOT’s target from a design stage. Each is an official’s target, printed as one.
What we will not print
Three things a brochure prints and this page does not.
An opening year as a fact
Every year above is somebody's target, named, with the date they said it. A target with no name and no date is not a fact, and we do not carry one.
A drive time after the road opens
The government's own line is that Kathu to Patong falls from 30 minutes to five. We print that as its claim, in the row above, and project nothing else: not airport to Patong, not airport to any shore, after any opening.
A price or value effect
No figure on this page says what a road, a terminal or a tram does to the price of a home. No such figure exists that we would stand behind, and we publish no yield or growth number for Phuket.
What it means if you are buying now
The island you drive in the next five years is the island of today’s roads. Buy for that, and treat the rest as upside you have not paid for.
The airport side: Layan, Bang Tao, Thalang
Reached today on the existing roads; the developers' own pages put Laguna Phuket at about 30 minutes from the airport. The tram and the airport's second phase would land here first, and neither has broken ground.
The Patong side: Kamala, Surin
The Kathu to Patong tunnel is the project that touches this side, and it is the furthest along: Cabinet in December 2026, opening targeted October 2031 if approved. Until then the hill road is the road.
The question to ask any seller
Which document gives that opening date, who signed it, and when? If the answer is a brochure, the date on this page is more recent.
For the shores themselves, start with Bang Tao and Layan or Kamala; for the island’s other large project, Siam Piwat’s ICONPHUKET at Thalang, opening in 2029 on the developer’s word.
Where we stand
We sell homes on this island and hold written, non-exclusive appointments from several developers here. We have no part in any of the three projects above and no better information about them than the public record; what we add is the date on every line. If you want a shore read for the roads it has rather than the roads it is promised, ask us directly.
Sources. Expressway phase 1 dates: The Nation, 16 September 2026, reporting Deputy Government Spokeswoman Ploytalay Laksameesangchan; phase 1 cost and length: The Nation, 13 September 2026, reporting EXAT’s infrastructure fund plan. Phase 2 and the tram’s electric-bus first stage: Government Public Relations Department, 22 October 2025. Airport: Bangkok Post, 16 May 2025 (capacity, 2029 target, Phuket airport director Monchai Tanode) and The Nation, 16 May 2026 (THB 10 billion, design stage).
Tram schedule: The Nation, 29 April 2024, reporting Transport Minister Suriya Juangroongruangkit. Every year printed is that official’s target as reported on that date. Rows were last checked on 10 October 2026 and are re-read before anyone quotes them. General information, not legal, tax or investment advice; no figure here is a yield or a forecast of value.